2
1
3
Vetter Collection tubs 0.3 bar / 4.35 psi PVC
Page 5/7
Fold the collecting tub in the way, that the air can escape (Folding
to the direction of the ination connection). Any remaining air
can be removed with a vacuum adaptor (Item No.: 1700018300) in
combination with an construction-site compressor adaptor (Item
No.: 1600012000).
Connect the construction-site compressor adaptor (1) to the cou-
pling of the vacuum adaptor (2) and turn it interlocking. Then
tighten the screwable part of t the vacuum adaptor. Now connect
the constructionsite compressor adaptor to the support frame.
Attach the quick-action coupling (3) to the connection hose of
the pressure regulator and open the hand valve of the pressure
regulator slowly.
After deation and before packing, the valve
must be unlocked again in order to guarantee
perfect ination when it is next used!
4.5 Care and Maintenance
The collecting tub and its ttings are to be cleaned after use. Clea-
ning of the collecting tub is normally made using warm water to-
gether with a soap solution and dried at room temperature. Store
in cool dry place and avoid sun exposure.
5. Inspections
The ination ttings and the collecting tub are to be checked for a
perfect and orderly condition each time before and after use:
9 The collecting tub is free of damage, e.g. tears, cuts, piercings,
splits, hard or soft areas caused by chemical or thermal ef-
fects.
9 The insertion tub is free of damage, e.g. tears, cuts, piercings,
splits, hard or soft areas caused by chemical or thermal ef-
fects.
9 Visual and operational check of the pressure reduction regu-
lator.
6. Taking the product out of operation
In case the collection tubs are taken out of operation then this
must be disposed of as special waste. If required, the manufac-
turer can supply you with more detailed information regarding
this.
Comments to this Manuals