Vetter Pneumatic Decon Tents
Page 7/11
4.5 Deation
The deation of the support frame happens over the ination connec-
tion. To deate the tent, close the air source (compressed air cylinder,
etc.) and disconnect the pressure reducer or the lling hose of the blo-
wer. The deation valve is opened by pressing-in and turning the pin (1)
counter clockwise.
1
Pin before locking Pressing-in + turning Valve open
Fold the tent in the way, that the air can escape (Folding to the direction
of the ination connection). Any remaining air can be removed with a
vacuum adaptor (Item No.: 1700018300) in combination with an const-
ruction-site compressor adaptor (Item No.: 1600012000).
Connect the construction-site compressor adaptor (1) to the coupling
of the vacuum adaptor (2) and turn it interlocking. Then tighten the
screwable part of t the vacuum adaptor. Now connect the construction-
site compressor adaptor to the support frame. Attach the quick-action
coupling (3) to the connection hose of the pressure regulator and open
the hand valve of the pressure regulator slowly.
It is also possible to deate the support frame with a blower with deate
function. Follow the operating instructions of the blower.
After deation and before packing, the valve
must be unlocked again in order to guarantee
perfect ination when it is next used!
2
1
3
Comments to this Manuals