Vetter Decon tent User Manual Page 8

  • Download
  • Add to my manuals
  • Print
  • Page
    / 12
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 7
Vetter Pneumatic Decon Tents
Page 7/11
4.5 Deation
The deation of the support frame happens over the ination connec-
tion. To deate the tent, close the air source (compressed air cylinder,
etc.) and disconnect the pressure reducer or the lling hose of the blo-
wer. The deation valve is opened by pressing-in and turning the pin (1)
counter clockwise.
1
Pin before locking Pressing-in + turning Valve open
Fold the tent in the way, that the air can escape (Folding to the direction
of the ination connection). Any remaining air can be removed with a
vacuum adaptor (Item No.: 1700018300) in combination with an const-
ruction-site compressor adaptor (Item No.: 1600012000).
Connect the construction-site compressor adaptor (1) to the coupling
of the vacuum adaptor (2) and turn it interlocking. Then tighten the
screwable part of t the vacuum adaptor. Now connect the construction-
site compressor adaptor to the support frame. Attach the quick-action
coupling (3) to the connection hose of the pressure regulator and open
the hand valve of the pressure regulator slowly.
It is also possible to deate the support frame with a blower with deate
function. Follow the operating instructions of the blower.
After deation and before packing, the valve
must be unlocked again in order to guarantee
perfect ination when it is next used!
2
1
3
Page view 7
1 2 3 4 5 6 7 8 9 10 11 12

Comments to this Manuals

No comments