Page 6/11
Vetter PZ 17 Decon 2 L
The Vetter decontamination path (PZ 40 3 L)
4.4 Instructions of the showers
The required amount of water can be regulated via the ball valve
(1).
In order to change the shower curtains the hand showers (2)
must rstly be uncoupled and the rubber washers (3) removed.
The shower curtain can now be removed by separating the Vel-
cro and pile fabric connections on the vertical support hose and
unhooking the eyelets (4) on the insertion basin.
3
2
4
1
2
Comments to this Manuals